DIEESM examine the state of operation and repair of non-nuclear Khmelnitsky NPP

From September 28 specialists of the State Inspectorate for operation of power plants and networks (DIEESM) conduct inspections Khmelnitsky NPP on the state of repair of the equipment operation and non-nuclear parts of nuclear power plants. In the commission chief state inspectorDIEESM and experts. Commission members hold Surveys Khmelnitsky NPP on the technical condition and operation of their organization as required by regulations and inter-sectoral regulations. The specialists will check the implementation of measures to prevent technological malfunction facilities KNPPorganization of emergency work, the investigation, execution and accounting process violations in accordance with instructions from the investigation process and accounting violations at nuclear plants, the preparations objects to work in the autumn-winter maximum load, the organization of personnel, etc. .. At the end of fahivtsi DIEESM prepare materials summarizing the results of surveys of sites Khmelnitsky NPP. Reported at

Source: http://artlife.rv.ua/


Go UP