Chernivtsi: Housing stock Sadgirsky area prepared for operation in the autumn-winter period of 2015-2016 years
Ongoing work to repair the networks of hot water supply, sewage systems, central heating, roofs and more. Total in the district, there are residential houses / apartments - 193/3329, including: * Housing Fund of communal property wouldbeats / sq. m. - 139/1558, including: * CH d. / Sq. - 15/727 * Water supply system. / Sq. - 43/1145 * Sewerage system. / Sq. - 43/1135 * Available housing condominiums, ZHBT, HBC d. / Sq. - 49/1571 * CH d. / Sq. - 7/727 * Water supply system. / Sq. - 46/1553 * Sewerage system. / Sq. - 41/1498 * Departmental housing d. / Sq. - 5/200 (including 3 dormitories Categoriesand 181 bunk-beds), including: * CH d. / Sq. - 3/181 * Water supply system. / Sq. - 4/193 * Sewerage system. / Sq. - 4/193 p / p The company, which serves Number of apartments Number of houses / apartments with D / O / preparedness Acts Was concluded agreements with TSA "Zhytlovyk" Availability readiness passports % Execution measures 1. PE "Sadgora Service" 139/1558 15/749 139/1558 84,3% 2. Condominiums, ZHBT 49/1571 7/732 83% 3. Departmental housing 5/200 3/181 1/96 80% Total: 82.4 * For homes of local councils Overhaul * Roofs (total: 760.670 thousand. UAH). * St. Hotinskaya, 45-D (607 m2 - 176.696 thousand. USD.) * St. Factory, 11-B (243.7 m2 - 156.176 thousand.) * St. Withavodska, 58 "B" (336 m2 - 140.223 thousand. UAH. condominium co-financing - 20%); * St. Factory. 58 "B" (310 m2 - 150.402 thousand. UAH. Condominium co-financing of 20%); * St. C. Galician, 18 (137.173 thousand. UAH.). * Networks HVP (total: 80.3 m / c - 66.223 thousand). * St. Karbulytskyi, 21 (38.5 m / c - 51.123 thousand). * St. Factory, 9 (41.8 m/ n - 15.100 thousand). * Net CO (total: 321.803 thousand). * St. Factory, 5 (206.7 m / c - 73.052 thousand.) * St. Factory, 9 (133.3 m / c - 50.353 thousand.) * St. Hotinskaya, 45 "B" (198.398 thousand. UAH.). * Sewerage (total: 88.7 m / n 84.062 thousand). * St. Factory, 7 (47.1 m / c - 68.981 thousand). * St. Factory, 9 (41.6 m / c -15.081 ths.). * Repair of balconies (26.563 thousand. UAH). * St. M. Torez, 52 (26.563 thousand. UAH.). * Repair headroom dymoventkanaliv (70,000 thousand. UAH). * St. I. Karbulytskyi 3 "A" (70,000 thousand. UAH.). PE "Sadgora - Service" Employees of PE "Sadgora - Service" was developed and submitted a comprehensive report on housing to prepare exploitationtion in the autumn-winter period in 2015-2016 gg. as of 08.09.2015 g .: p / p Address of the object Type of works Unit The task of training In fact prepared % Preparation 1 Repair HVP networks d / m / n 11/122 9/86 82% 2 Repair sewerage d / m / n 8/46 6/28 75% 3 Repair the roof, including: METAL Slate Roundd. / m? d. / m? d. / m? d. / m? 20/307 3/50 16/217 1/40 16/180 80% 4 Repair headroom dymoventkanaliv d. / pcs. 6/16 5/25 83% 5 Repair of doors d. / pcs. 47/101 39/89 83% 6 Repair of power supply networks (Switchboard) d. / pcs. 24/27 21/21 87% 7 Preparation posylochnoho material m? 10 10 100% Total: 84,3% AdditionOh, now concluded a contract with TSA "Zhytlovyk" for works on clearing dymoventkanaliv in homes, serviced PE "Sadgora-Service" works are carried out according to schedule. As of 01.09.2015, the TSA "Zhytlovyk" already verified in 114 buildings (460 apartments), representing 82% of the total. Zaborhovanosthose companies for gas supply has not. Debt enterprise has no power. Debt residents in rent is 360.3 thousand. UAH. * The combined associations condominiums (OTSBB) 2.1. OTSBB "Vityaz" in the service of four residential buildings (632 apartments). Arrears of tovarystva to service providers available. Debt residents in rent is 130.0 thousand. UAH. During the preparation of housing for the autumn-winter period performing the following work: Number of claims Task Ed. meas. plan fact % done. 1 Replacement of internal sewer networks in w / b 49 "A" on the street. Khotyn d. m / n 20 m / s 20 m / s 100% 2 Technical expertise elevators and repair machinery spaces w / w on the street. Khotyn, 49 "B" entrances 1,3,4,5,6 pcs. / m? 5 pcs. / 90m? 5 pcs. / 90m? 100% 3 Lighting stairwells (replacement lampshades) w / b 49, 49 "B" on the street. Khotyn d. pcs. 27 pcs. 27 pcs. 100% 4 Replacement of internal networks HVP w / w 49"B" on the street. Khotyn d. m / n 40 m / s 20 m / s 50% 5 Repair parapets w / w 49 "B" on the street. Khotyn m? 60 m? 30 m? 50% 6 Glazing and insulation of window frames in the basement pcs. / m? 13 pcs. / 26 m? 13 pcs. / 26 m? 100% 7 Replacement of ceiling lighting in the elevator cabs d. pcs. 13 pcs. 13 pcs. 100% Total: 85.7 2.2. OTSBB "Elite" servicingThere are 11 apartment buildings (184 apartments). Debt to Society service providers absent Debt residents to rent No Number of claims Task Ed. meas. plan fact. done. % done. 1 Repair window frames w / w 21,23 Street. Kuznetsova pcs. 8 pcs. 4 pcs. 50% 2 Repair porch w / w number 58 on the street. Kashtanova bud. m? 80 m? 80 m? 100% 3 Repair roof w / b 53 number "I" on the street. Kashtanova d. m? 200 m? 200 m? 100% 4 Repair porch w / w 23 on the street. Kuznetsova d. m? 300 300 100% Total: 87,5% 2.3 condominiums "Victoria - 72" Number of claims Task Ed. meas. plan Fact. done. % Done. 1 Repair window frames pcs. / m? 18 pcs. / 15 m? 100 100%2 Revision and cleaning pollutants CO d. pcs. 4 pcs. 4 pcs. 100% 3 Covering vidmostky d. m / n 80 m / s 80 m / s 100% Total: 100% 2.4 condominiums "Hotinskaya, 47" B " Number of claims Task Ed. meas. plan Fact. done. % Done. 1 Replacement of internal networks CH d. m / n 150m / n 0 0 Total: 0 2.5 condominiums "Dream-98" Number of claims Task Ed.meas. plan Fact. done. % Done. 1 Repair door d. pcs. 2 pcs. 2 pcs. 100% Total: 100% 2.6 condominiums "Eight" Number of claims Task Ed. meas. plan Fact. done. % Done. 1 Repair headroom hoods d. pcs. 16 pcs. 16 pcs. 100% Total: 100% 2.7 condominiums "Factory 56" G "" Number of claims Task Ed. meas. plan Fact. done. Vic%Online. 1 Replacement door d. pcs. 1 pc. 1 pc. 100% Total: 100% 2.8 condominiums "Hotinskaya, 64" A " Number of claims Task Ed. meas. plan Fact. done. % Done. 1 Replacement door d. pcs. 1 pc. 1 pc. 100% 2 Repair of the facade d. / m? 580 m? 580 m? 100% 3 Replacement of window frames d. pcs. 4 pcs. 4 pcs. 100% Total: 100% OS 2.9BB "Ash 9 Number of claims Task Ed. meas. plan Fact. done. % Done. 1 Repair headroom hoods d. pcs. 10 pcs. 5. 50% Total: 50% 2.10 condominium "Star -10" Number of claims Task Ed. meas. plan Fact. done. % Done. 1 Replacement of window frames pcs. / m? 1pc. / 1 ??m? 1pc. / 1 ??m? 100% 2 Repair vidmostky d. m / n 5 m / s 5 m / s 100% Acceptth: 100% 2.11 condominium "owner" Number of claims Task Ed. meas. plan Fact. done. % Done. 1 Replacement of internal networks HVP d. m / n 50 m / s 25 m / s 50% Total: 50% 2.12 condominium "Factory 56" B " Number of claims Task Ed. meas. plan Fact. done. % Done. 1 Repair of the facade (color) d. / m? 100 m? 100 m? 100% Total: 100%* For housing - building societies, there are residential houses / flats - 2/63, including: 3.1 ZHBT number 17 (st. I. Karbulytskyi, 2 A). Debt residents on rent is 3,0 thousand. UAH. For the actions to prepare residential building for the autumn-winter period performed the following work: Number of claims Task Ed. youm. plan Fact. done. % Done. 1 Replacement of drainage elements d. m / n 12 m / s 12 m / s 100% 2 Replacement of internal sewer networks d. m / n 5 m / s 5 m / s 100% 3 Painting basement d. / m? 200m? 200m? 100% Total: 100% The percentage of readiness for condominiums is - 83% Will notifyDo Chernivtsi city councilSource: http://artlife.rv.ua/